FROM THE CAB
NOTES FROM THE
SUNSHINE COAST.
Practical reads on tight-access excavation, pool digs, site prep and working with the weather.

20 October 2026
Tight-access excavation: getting machinery where trucks can’t
A 1.7 tonne excavator opens up side gates, narrow backyards and awkward corners that full-size machinery simply cannot reach.
Read more
8 October 2026
Preparing your site for a pool: what to expect
From the first cut to a clean, level hole — a practical look at how a pool excavation comes together on a residential block.
Read more
22 September 2026
Wet season earthworks on the Sunshine Coast
Summer rain changes how — and when — earthworks should be done. A few practical notes on timing your dig.
Read more